Project Croatia (Gabion Mesh Machine)

Project Croatia (Gabion Mesh Machine)

Summary

On 19th December 2021, we finished loading container of gabion machine for our customer from Croatia and it will be dispatched to Croatiaon 24th December.

Project location:  Croatia
Project Background:
On 19th December 2021, we finished loading container of gabion machine for our customer from Croatia and it will be dispatched to Croatiaon 24th December.
This gabion machine adopt imported electrical appliances to produce 4.5m gabion mesh roll with mesh size 100*120mm.
Solution:
We checked every parts very carefully before loading container to ensure high quality gabion machine from CANDID. We did trial running for around 2 tons galvanized wire to ensure that there will be no problem when our customer received the gabion machine. The control cabinet is packed in wooden case and other parts are all wrapped with plastic film to protect the machinery from being damaged during transportation.
Success feedback:
Providing excellent quality machine and professional service to customer is always our pursuit. The customer is very satisfied after the gabion machine is received.
CANDID CEO Mr. Zheng in Nepal for Gabion Machine maintenance