Q: How long does it take of the installation and trial running of wire drawing machine take?
- Share
- Issue Time
- Aug 28,2014
Q: How long does it take of the installation and trial running of wire drawing machine take?
A: If foundation and everything is prepared, time of installation and trial running is about 10 working days. Then it can be put into usage.